CP Napinka Subdivision

The CP Napinka subdivision runs from Killarney, MB to Napinka, MB.

MileStationSiding
49.0Beginning of Track
53.0KILLARNEY
62.2NINGA
Grain elevator
69.8BOISSEVAIN
89.9DELORAINE
Grain elevator
100.2MEDORA
108.5NAPINKA
Junction with CP Estevan subdivision

The maximum speed limit on the CP Napinka subdivision is 30 MPH. Cars over 268,000 pounds must not exceed 10 MPH between mile 49.0 and mile 76.1.

The subdivision operates under the Occupancy Control System (OCS) between the station sign at Killarney and the station name sign at Napinka. It is rule 105 (non-main track) territory between Killarney and end of track at mile 49.0.

For comparison, here is the September 25, 1938 (CP Employee Timetable #77) version of the CP Napinka subdivision.

MileStationSiding
0.0LA RIVIERE
7.5WOOD BAY
Junction with CP Snowflake Subdivision
27
12.4PILOT MOUND (grain elevator)32
17.0CRYSTAL CITY
Grain elevators
32
21.2CLEARWATER
Grain elevators
34
28.7MATHER (grain elevator)32
35.5CARTWRIGHT41
42.8HOLMFIELD
Grain elevators
34
51.4KILLARNEY
Grain elevators
51
57.7RHODES40
62.2NINGA
Grain elevator
40
69.8BOISSEVAIN
Grain elevators
Junction with CP Boissevain Subdivision
46
75.1CADZOW
80.3WHITEWATER44
85.3NAPLES29
89.9DELORAINE
Grain elevator
Junction with CP Lyleton Subdivision
62
95.2LEIGHTON
100.2MEDORA
Grain elevators
38
108.7NAPINKA
Junction with CP Estevan subdivision

Up | Back to home