CP Lyleton Subdivision

The CP Lyleton subdivision ran from Deloraine, MB to Lyleton, MB. It was abandoned in early 1996 and was removed.

Here is timetable information for the Lyleton subdivision from the September 25, 1938 employee timetable #77.

MileStationSiding
0.0DELORAINE
Junction with CP Napinka subdivision
Grain elevator
8.4GOODLANDS
Grain elevator
27
12.4CRANMER
(used to have a UGG elevator)
17.2WASKADA
Waskada grain elevator
41
21.9DALNY
Grain elevator
28
28.0COULTER
Grain elevator
41
32.4CAMERON
Grain elevator
41
37.2LYLETON
Grain elevator
41
Damaged bridge between Dalny and Coulter
Damaged bridge between Dalny and Coulter

The maximum speed limit on the CP Lyleton subdivision in 1938 was 40 MPH for passenger trains, 25 MPH for mixed trains and 20 MPH for freight trains.

CP in Manitoba

1 thought on “CP Lyleton Subdivision”

Comments are closed.