The CP Irricana subdivision ran between Bassano to Irricana, Alberta.
The section between Standard and Irricana was abandoned in 1976. The remainder between Bassano and Standard was rehabilitated in 1980 as part of the Branch Line Rehabilitation Program.
In 2005 the subdivision ran from Bassano to Standard (35.8 miles) and was up for abandonment. However, it remained as the Irricana spur off the CP Brooks subdivision.
The following is from the April 26, 1953 CP employee timetable.
Mile | Station | Siding |
---|---|---|
0.0 | BASSANO Junction with CP Brooks subdivision | – |
6.6 | GRANTA | – |
13.4 | MAKEPEACE | – |
21.0 | HUSSAR | 42 |
29.2 | CHANCELLOR | 38 |
35.8 | STANDARD | 36 |
45.5 | TUDOR | – |
50.8 | HAMLET | – |
52.4 | – | – |
54.9 | NIGHTINGALE | – |
62.5 | GAYFORD | – |
67.8 | CRAIGDHU | – |
72.5 | IRRICANA Junction with CP Langdon subdivision | – |