CP Varcoe Subdivision

The CP Varcoe subdivision ran from MacGregor to Varcoe, Manitoba. This branch line was abandoned in 1978.

The following information is from the CP October 27,1974 employee timetable.

MileStationSiding
0.0MACGREGOR
3.1Crossing of CN Rivers subdivision
11.0PINE CREEK
17.3EDRANS
26.7WELLWOOD
Grain elevator
29.4Crossing of CN Neepawa Subdivision
33.5OBERON
Grain elevator
36.9BROOKDALE
Grain elevator
47.0MOOREPARK
Grain elevator
55.5VARCOE
Junction with CP Miniota Subdivision (formerly known as CP Rapid City)

In 1974 the speed limit over the entire subdivision was 15 MPH.